![]() ![]() Refer to the Drawings and Project Manual for the full extent of the Work. Work will be awarded as a single contract. The project will also include replacement of the LTTV studio air handler and its controls and all associated work. The Work includes, but is not limited to, removal and replacement of the existing library air handler, portions of the ceiling and ductwork and new digital controls. 2022.072 ATTN: BRIAN STACHACZ, DIRECTOR OF BUSINESS SERVICES The Work shall take place at the North Campus. Brainard Avenue LaGrange, IL 60525 will receive sealed bids for: LYONS TOWNSHIP HIGH SCHOOL- 2023 North Building Library and LTTV Studio Air Handler Replacement Project Project No. The Board of Education, Lyons Township High School District 204, Administrative Offices, 100 S. J041-*SPECIAL* Hines and Joliet Critical Cooling Repairs Y1da-537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Constructionīus Garage Roof-top Unit Replacement at Palatine High School RFP - HVAC Repair and Maintenance Servicesīoilers 3, 4, 5 and MCC Replacement Stickney Water Reclamation Plant ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |